Wireless Everywhere

The goalWireless that works everywhere you doEvery floor, yard and site, not just the spots near an access point.
How to work with usOne step or all fiveEach step is a service on its own. Together they're one project with one team.
Where it startsYour site addressTell us where it is and what isn't working. Floor plans help, but you don't need them.
What it takes

Five kinds of work get you to wireless everywhere.

Coverage in every corner doesn't come from buying more equipment. It comes from knowing the site, designing for it, installing it properly, proving it and keeping it running.

Those are our five steps. Each one is something we do well on its own, and each ends with something concrete you keep: a brief, a design package, a working install, a test record, a support plan. Bring us in for the one piece you're missing, or let one team carry it from the first floor plan to day-two support.

  • One step or all five
  • One team
  • One written record
The five steps to wireless everywhere and what each one producesAssess produces a requirements brief. Design produces a design package. Deploy produces an installed network with its schedule and change log. Verify produces a test record. Manage produces a support plan. Hire Nettelix for one step or all five.DWIRELESS EVERYWHERE · WHAT EACH STEP PRODUCESNTS01ASSESSREQUIREMENTSBRIEF02DESIGNDESIGNPACKAGE03DEPLOYINSTALL &CHANGE LOG04VERIFYTEST RECORD& AS-BUILT05MANAGESUPPORTPLANONE STEP OR ALL FIVE · ONE TEAM · ONE WRITTEN RECORDILLUSTRATIVE
What each step produces. The next step starts from it, whether we did the last one or someone else did.
The five steps

What each step is for.

Each page explains what happens, what it looks like on its own, what we prepare and what you walk away with.

StepThe goalWhat happensWhat you getDetails
01AssessFind out what has to work, and why it doesn't today.We learn the sites and the problemA written assessment and briefExplore →
02DesignDesign around how the space is actually used.We model coverage and capacityA design package and parts listExplore →
03DeployGet it ordered, scheduled and installed.Ordering, scheduling and installationA working install and one project leadExplore →
04VerifyProve it works where it matters.Testing against what was agreedA test record and as-built drawingsExplore →
05ManageKeep it working after go-live.Monitoring, support and upkeepFully managed, co-managed or on callExplore →
One step or all five

Start with the step you're missing.

You don't have to begin at step one, and you don't have to hire us for all five. Tell us where things stand and we pick up from there.

A site that isn't working

Dead zones, dropped calls, a yard where scanners lose connection. We start by finding out why.

Starts at AssessAssess →

A new building or location

A new office, warehouse or store that needs to work on opening day.

Starts at DesignDesign →

A design that needs building

You already have a plan or a scope and need it ordered, scheduled and installed.

Starts at DeployDeploy →

An install you're not sure about

It was installed, but nobody proved it works where it matters.

Starts at VerifyVerify →

Several locations at once

A multi-site rollout that should look the same everywhere and still fit each building.

Starts at DesignDesign →

A network nobody owns

It's live, but no one watches it after hours or chases the carriers.

Starts at ManageManage →

Our approach

How we work, whichever step you start with.

The same four habits run through every step.

  1. Start from your floor plans

    Most projects begin with drawings and a conversation. We model coverage before anyone climbs a ladder.

  2. On site when it matters

    We survey in person when the building is unusual or the plans aren't enough.

  3. You approve before we order

    Scope, drawings, parts and schedule are agreed in writing first.

  4. Proof that fits the project

    From a focused walk-through to a measured survey, when the project calls for it.

What you get

What you keep at the end.

01

Requirements brief

What had to work, where, and how we agreed to measure it.

02

Design package

Drawings, heatmaps, parts list and configuration standards.

03

Schedule and change log

Who did what, when, and every decision that changed the plan.

04

Test record

Where we tested, what we measured, and what we fixed.

05

As-built documentation

What was actually installed, where, and how it's set up.

Practical next step

Tell us which step you need.

One step or all five. Share the sites, the problem and the timing, and we pick up from there.

Start your project