Use case · Indoor Cellular & DAS

Cell service as a building amenity for every tenant.

Window offices work, interior suites and lower floors don't, and every tenant tries its own fix. A shared indoor system covers the whole building once.

TYPICAL SPACEMulti-tenant office towers
WHAT HURTSCoverage varies by suite
WHAT WE CHANGEOne building-wide system
Sound familiar?

What it looks like day to day.

A typical scenario based on the environments we work in, not a specific customer.

  • Tenants complain about service in interior suites
  • Some tenants install their own boosters
  • Prospects ask about signal during tours
  • Elevators, lobbies and parking are dead zones
Coverage depends on the suite compared with Every floor, lobby and garageBuilding section. Existing: outdoor macro signal reaches upper floors weakly; measured signal falls with each floor and there is no service below grade. Proposed: a donor antenna feeds a headend and riser that serve antennas on every floor, around -66 dBm throughout.AEXISTING CONDITIONSNTSGRADE ±0'MACROL6-88 dBmL5-94 dBmL4-101 dBmL3-108 dBmL2-112 dBmL1-116 dBmB1NO SVCEXISTING · MEASURED RSRP BY FLOORGAPSBPROPOSED DESIGNNTSGRADE ±0'MACROL6-66 dBmL5-67 dBmL4-68 dBmL3-66 dBmL2-67 dBmL1-68 dBmB1-66 dBmHEDONORRISERPROPOSED · DAS · RSRP BY FLOORALL FLOORSA — Coverage depends on the suiteB — Every floor, lobby and garage
Sheet A shows existing conditions; sheet B shows the proposed design. Illustrative, not to scale.
Why it happens

One building, one system.

Coverage in a tower varies by height, core and orientation. Piecemeal tenant fixes cause interference and don't cover common areas. A building-wide system is planned once and grows with the tenants.

What we do

How we fix it.

Indoor cellular (often called DAS) brings AT&T, Verizon and T-Mobile signal inside your building and spreads it where people are, so calls, texts and data just work.

  1. Assess the building

    Signal by floor, core, lobby, elevators and parking.

  2. Design a shared system

    One platform sized for every floor, with room to expand.

  3. Coordinate with carriers

    Signal source and approvals handled for each carrier.

  4. Install floor by floor

    Minimal disruption to occupied suites.

Designs start from your floor plans and each carrier's signal. We survey on site when the building calls for it.

What changes

What's different after.

An amenity that leases

Coverage becomes part of the building's value.

No rogue boosters

One engineered system instead of tenant fixes.

Common areas covered

Lobbies, elevators and parking included.

Is it a fit?

Where this works, and where something else fits better.

We recommend what solves the problem, even when it's a different solution.

A good fit for

  • Multi-tenant office towers
  • Mixed-use buildings
  • Owners planning renovations or repositioning

Something else may fit better

  • A single small tenant may be better served by a smaller system for its own suite
For your IT or engineering team

Technical detail

The design decisions, the end-to-end path and how the result is tested.

Show

The technical design and commercial operating model must both support multiple carriers and changing tenants.

Design decisions

Design decisionWhat we need to understandHow we engineer it
Carrier participationIdentify tenant carrier mix, source options, approval, and contribution paths.Build a supported roadmap rather than promising all carriers by assumption.
Common zonesPrioritize lobby, elevators, amenities, management, parking, and tenant floors.Create measurable base-building service and documented tenant-extension rules.
Lifecycle modelDefine ownership, monitoring, access, maintenance, upgrades, and tenant changes.Operate the DAS like a building system with accountable records.

The end-to-end path

  1. CARRIER SOURCESOperator A · B · CApproved signals and bands
  2. SHARED HEADENDCondition · combine · alarmBase-building service platform
  3. VERTICAL DISTRIBUTIONFiber riser · floor remotesScalable coverage by zone
  4. TENANT SERVICESuites · core · amenitiesNative mobile experience

A shared physical platform does not guarantee immediate participation by every carrier. Commercial and technical onboarding must be managed explicitly.

How the result is tested

  • Tenant-floor test Measure perimeter, interior, core, and meeting areas by carrier.
  • Vertical test Walk elevators, stairs, lobbies, and floor transitions.
  • Common-area test Verify amenities, management, loading, and parking zones.
  • Capacity test Observe service during planned occupancy and peak tenant demand.
  • Alarm test Trace source, headend, remote, power, fiber, and antenna faults.
  • Change test Revalidate after major partition or tenant construction changes.
Practical next step

Tell us where the phones stop working.

Share what's happening and where. We'll recommend the right fix and the next step, starting from your floor plans or site details.